BriefBank

SIMS 213
Spring 2002

John Fritch
Tom Selsley
Kaichi Sung
Mary Trombley
email whole group
 
Final Report
(Comprehensive)
Final Presentation [PPT]
 
Third Interactive Prototype
(Requires MSIE 5.x., Navigator 6.x or Mozilla 1.x)
Second Interactive Prototype
(Requires MSIE 5.x.)
First Interactive Prototype
(Requires MSIE 5.x.)
 
Assignment 1
(Project Proposal)
Assignment 2
(Project Personas, Goals, and Task Analysis)
Assignment 3
(Project Scenarios, Competitive Analysis, and Preliminary Design)
Assignment 4
(Lo-fi Prototype and Usability Tests)
Assignment 5
(First Interactive Prototype)
Assignment 6
(Project Heuristic Evaluation)
Assignment 7
(Second Interactive Prototype)
Assignment 8
(Pilot Usability Study)
 
Work Distribution
 
Heuristic Evaluation for MDTP Project


SIMS 213 Assignment 6

Project Heuristic Violations

An independent project group conducted a heuristic evaluation of BriefBank's first interactive prototype. Following is a link to an Excel file listing the violations. We will address these violations when we develop the second interactive prototype.

Heuristic Violations [Excel, 24kb]